Featured Projects
COVID-19 Relief
2020
As of August 14th, we have delivered over 500 cellphone chargers, over 1600 camp lights, and over 200 flashlight/chargers to 9 relief groups and 2 tribal entities working in 4 tribal communities. We were able to make kits of 3 products from Goal Zero, Mpowerd, Makers4Good, and Voltaic.
Solar Workforce Training
2019
Our first workforce training held in Hardrock, AZ. Ten amazing Navajo participants spent 7 weeks in the classroom and doing hands on learning. Shout out to the chapter and To Nizhoni Ani for partnering with us, and the many speakers that spoke at our training.
Off-Grid Install on Navajo
2018
This is one of the 2.1 kW systems we installed for a family on the Navajo reservation. The system is able to power an energy star rated refrigerator, lights, and small electronics.
Intro to Solar at Navajo Nation Museum
2018
We hosted a classroom and lab activities on Residential Solar Energy Basics in Window Rock, AZ with Tewa Energy Services.
Forest Lake Chapter, AZ
2016
Where it all started, our first project partnering with Forest Lake Chapter, Black Mesa Water Coalition, the Navajo Tribal Utility Authority, Give Power, Solar City, and Empowered By Light.
Standing Rock, ND
2016
This was our first off-grid project. We partnered with Hopi/Navajo solar installer Brett Isaac, Empowered By Light, Solutions Project, family and friends to deliver two solar trailers to Standing Rock in 2016.